4 flow from screen creation and to run operation, Flow from screen creation and to run operation -5, Sy stem composition – IDEC High Performance Series User Manual

Page 29: 4flow from screen creation and to run operation

Advertising
background image

WindO/I-NV2 User’s Manual

1-5

4 Flow from Screen Creation and to Run Operation

1

Sy

stem Composition

The following flowchart describes the sequence of step from the screen creation for the MICRO/I to the Run
operation.

4

Flow from Screen Creation and to Run Operation

1

Launch the WindO/I-NV2

2

Creating a Project and Screen

Modifying the project

5

Troubleshooting

7

Maintenance

3

Downloading the project

4

Debug

6

RUN

( refer to Chapter 2 “2.1 Starting WindO/I-NV2” on page 2-39)

Creating a new project ( refer to Chapter 4 “1.1 Creating New Project Data” on page 4-1)

• Creating new screens ( refer to Chapter 5 “2.1 Creating Screens” on page 5-2)

( refer to Chapter 24 “2 Downloading” on
page 24-14
)

(refer to Chapter 25 “Monitor Function” on
page 25-1
)

( refer to Chapter 35 “Troubleshooting” on
page 35-1)

(refer to Chapter 27 “Maintenance” on page
27-1)

Advertising
This manual is related to the following products: