Table 13-57. 47 Pickup Settings

Pickup Settings

(Negative-Sequence Voltage)

Purpose

S0-47=24,50ms

Sets 47 PU at 24 V, Time Delay at minimum.

S0-47=30,50ms

Sets 47 PU at 30 V, Time Delay at minimum.

S0-47=36,50ms

Sets 47 PU at 36 V, Time Delay at minimum.

Step 3: Prepare to monitor 47 function operation. Operation can be verified by monitoring OUT1.

Step 4: Connect and apply a 50 Vac, single-phase voltage source to Terminals C13 (A-phase) and C16

(neutral). Refer to Figure 12-4 for terminal locations.

Step 5: Negative-sequence voltage is 1/3 the phase voltage, therefore for a V2 setting of 24 volts, the

applied phase voltage will be 24 x 3 or 72 volts. Slowly increase the A-phase voltage until OUT1
closes. Pickup should occur within

±2 percent or 1 volt of the pickup setting. Slowly decrease

the A-phase voltage until OUT1 opens. Dropout should occur between 97% and 98% of the
actual pickup value. Verify the 47 target on the HMI.

Step 6: Verify the pickup and dropout accuracy of the middle and upper 47 pickup settings.

Step 7: (Optional.) Repeat Steps 2 through 6 for the B-phase and C-phase voltage inputs.

Step 8: (Optional.) Repeat Steps 2 through 7 for Setting Group 1.

Negative-Sequence Voltage Timing Verification

Step 1: Using Table 13-58 as a guide, transmit the first row of setting commands to the relay.

Table 13-58. 47 Pickup and Time Delay Settings

Pickup and Time Delay Settings

Purpose

S0-47=36,2S

Sets 47 PU at 36 V, Time Dial at 2 seconds

S0-47=,5S

Sets 47 PU at 36 V, Time Dial at 5 seconds

S0-47=,10S

Sets 47 PU at 36 V, Time Dial at 10 seconds

Step 2: Prepare to monitor the 47 timings. Timing accuracy is verified by measuring the elapsed time

between a sensing voltage change and OUT1 closing.

Step 3: Connect and apply a 100 Vac, single-phase voltage source to Terminals C13 (A-phase) and

C16 (neutral). Refer to Figure 12-4 for terminal locations.

Step 4: Step the A-phase voltage up to 115 volts. Measure the time delay and verify the accuracy of the

47 time delay setting. Timing accuracy is

±5 percent or ±3 cycles of the time delay setting.

Step 5: Repeat Step 5 for the middle and upper time delay settings of Table 13-58.

Step 6: (Optional.) Repeat Steps 2 through 5 for the B-phase and C-phase voltage inputs.

Step 7: (Optional.) Repeat Steps 2 through 6 for Setting Group 1.

Over/Underfrequency (81) (BE1-700V)

Purpose: To verify the operating accuracy of the 81/181/281/381/481/581 protection elements.

Reference Commands: SL-x81, SL-VO, S<g>-x81, S<g>-81INH

Over/Underfrequency Pickup Verification

Step 1: Prepare the x81 pickup functions for pickup testing by transmitting the commands in Table

13-59 to the relay.

13-36

BE1-700 Testing and Maintenance