Synchronism Check (25) (Optional)

Purpose: To verify the operation of the Sync Check (25) function.

Reference Commands: SL-25, SL-V0.

25VM - VTP and VTX Live Voltage, Dead Voltage Pickup Test

Step 1: Prepare the 25 function block for testing by transmitting the commands in Table 13-62 to the

relay.

Table 13-62. Sync-Check Pickup Test Commands

Command

Purpose

A=

Gains write access.

SL-N=NONE

Zero out custom logic settings. Overwrite with LOGIC=NONE settings.

Y

Confirm overwrite.

SL-N=25

Sets 25 as custom logic name.

SG-VTP=1,4W,PN,PN

Set VT phase voltage parameters.

SG-VTX=1,AN

Set VT auxiliary voltage parameters.

SL-25=1,0

Enable 25 function.

SL-VO1=25VM1

Enables OUT1 to close for 25VM1.

EXIT;Y

Exit and save settings.

Step 2: Using Table 13-63 as a guide, transmit the setting commands to the relay.

Table 13-63. Sync-Check Voltage Monitor Pickup Settings

Sync Check VM Pickup Settings

Purpose

S0-25VM=95,55,0,123

Sets LV = 95, DV = 55, TD = 50, VM1 = 123.

Step 3: Prepare to monitor the 25VM function operation. Operation can be verified by monitoring OUT1.

Step 4: Connect relay Terminals C13 (A-phase), C14 (B-phase), and C15 (C-phase) together. Apply a

single phase, 0 Vac, 50 or 60 hertz ac voltage source (Line VTP) to the three jumpered
terminals and the neutral Terminal (C16).

Step 5: OUT1 should be closed. Slowly increase the line voltage until OUT1 opens (55 volts). Dropout

should occur within

±2% or 1 volt of the Dead Voltage setting. Lower the voltage until OUT1

closes. Pickup should be between 97% to 98% of the actual dropout value. Increase the voltage
until OUT1 opens. Continue to increase the voltage until OUT1 closes (95 volts). Pickup should
occur within

±2% or 1 volt of the hot voltage setting. Lower the voltage until OUT1 opens.

Dropout should occur between 97% and 98% of the actual pickup value. Remove voltage
source 1.

Step 6: Connect a second single-phase 50 or 60-hertz voltage source (Auxiliary VTX) to relay Terminals

C17 (polarity) and C18 (non-polarity). Apply 0 Vac.

Step 7: Output 1 should be closed. Slowly increase the Auxiliary voltage until OUT1 opens (55 volts).

Dropout should occur within

±2 percent or 1 volt of the Dead Voltage setting. Lower the voltage

until OUT1 closes. Pickup should be between 97 to 98% of the actual dropout value. Increase
the voltage until OUT1 opens. Continue to increase the voltage until OUT1 closes (95 volts).
Pickup should occur within

±2 percent or 1 volt of the Hot Voltage setting. Lower the voltage

until OUT1 opens. Dropout should occur between 97% and 98% of the actual pickup value.

Step 8: (Optional.) Repeat Steps 2 through 7 for Setting Group 1.

25VM Live/Dead Dropout Timing Verification

Step 1: Using Table 13-64 as a guide, transmit the setting commands to the relay.