1 standard project "plc_application.pro, Standard project "plc_application.pro, Supplied – Lenze E94AxPExxxx User Manual

Page 40: 4plc functionality

Advertising
background image

4

PLC functionality

4.2

Preparations for creating a PLC program

40

Lenze · 9400 Servo PLC· Reference manual · DMS 4.0 EN · 11/2013 · TD05/06

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

4.2.1.1

Standard project "PLC_Application.pro"

»Engineer« supplies a standard project for the controller. This standard project should generally

provide the basis of each PLC project.
The main window of »PLC Designer« shows the Object Organizer which is important for the

following descriptions with the Blocks, Data types, Visualisations and Resources:

Tab Blocks
The Blocks tab of the standard project contains

• Application (PRG)
• Idle (PRG)
• User (PRG)
• Visu (PRG)

Tab Data types
The Data types tab of the standard project contains 60 different user data type for ports.

Tab Visualisations
This tab will not be discussed in greater detail within the scope of this manual.

Tab Resources
The Resources tab of the standard project contains

• the tasks Application Task, User Task, Visu Task and Idle Task in the task configurations. The

associated description can be found in the section

Configuring tasks

( 43)

• 60 global variables for accessing the ports in the Ports list
• 60 user codes for mapping the ports in the parameter manager.
• the libraries IecSfc.lib, standard.lib and SysLibCallBack.lib in the library manager

Tip!
An online help is also available for »PLC Designer«. It can be accessed by pressing the <F1>

button when being in the program.
Information that cannot be described in detail here in the manual is explained there, e.g.

the components mentioned above.