3 Workplace

tiamo 2.4

■■■■■■■■

129

3.6

Run subwindow

3.6.1

Run - General

Subwindow: Workplace

Run subwindow
The Run subwindow contains the controls for controlling method runs
and for administering sample data. It is always displayed in the Work-
place
program part, i.e., it cannot be removed from the workplace view.
The subwindow can be enlarged and reduced as required; it can also be
maximized.

Tabs
The Run subwindow consists of the following three tabs:

Single determination
Control of single determinations.

Determination series
Control of determination series.

NOTE

If a run has been started on the Single determination tab (Status =
BUSY), then the Determination series tab is no longer accessible
(disabled). The same holds true for the Single determination tab in
the event that a run has started on the Determination series tab.

3.6.2

Run test

Menu item: Workplace

Tools Run test

NOTE

In contrast to the Sample table test, which is only used to check
whether or not all sample data is correct, the Run test also checks the
required hardware.

Single determination

The menu item Tools

Run test or the symbol is used to perform

the start test for the selected method. The precondition for this is that the
workplace is in READY status.

For the Run test, the dialog window Run test - 'Workplace name' -
Single determination
opens, in which information concerning the test is
displayed.