Report templates, Templates toolbar, Activating a schedule – Brocade Network Advisor SAN User Manual v12.3.0 User Manual

Page 297: Deactivating a schedule

Advertising
background image

Brocade Network Advisor SAN User Manual

245

53-1003154-01

Reports

6

Activating a schedule

To activate a schedule, complete the following steps.

1. Click the Reports icon.

2. Click the Schedules tab.

A list of scheduled reports display.

3. Select the schedule you want to activate and click Activate.

Deactivating a schedule

To deactivate a schedule, complete the following steps.

1. Click the Reports icon.

2. Click the Schedules tab.

A list of scheduled reports display.

3. Select the schedule you want to deactivate and click Deactivate.

Report templates

The Templates page enables you to run, import, export, share, or delete reports.

Templates toolbar

The toolbar is located on the upper right side of the tab and provides buttons and fields to perform
various functions.

FIGURE 109

Templates toolbar

1. Delete button — Select one or more templates that you want to remove from the list and click to

delete. You can only delete templates that you create. For step-by-step instructions, refer to

“Deleting reports, schedules, or templates”

on page 238.

2. Share button — Select a schedule and click to share a template. For step-by-step instructions,

refer to

“Sharing report templates”

on page 247.

3. Un-Share button — Select a schedule and click to stop sharing a template. For step-by-step

instructions, refer to

“Removing a report from the shared templates”

on page 248.

4. Import button — Click to import a template. For step-by-step instructions, refer to

“Importing

report templates”

on page 247.

5. Export button — Select a schedule and click to export a template. For step-by-step instructions,

refer to

“Exporting report templates”

on page 247.

Advertising