Switch, port, and lag deployment – Brocade Network Advisor SAN User Manual v12.3.0 User Manual

Page 690

Advertising
background image

638

Brocade Network Advisor SAN User Manual

53-1003154-01

Switch, port, and LAG deployment

16

Port Control - Select an authorization mode from the list to configure the ports for
authorization. Options include auto, force-authorized, or force-unauthorized and the
default value is auto.

6. When you have finished the configuration, click OK to launch the Deploy to Ports dialog box.

Refer to

“Switch, port, and LAG deployment”

on page 638 for more information.

Switch, port, and LAG deployment

The Deploy to Products, Deploy to Ports, and Deploy to LAGs dialog boxes provide the flexibility to
commit DCB configurations either right away or at a scheduled time. These dialog boxes also allow
you to commit the switch-level configuration changes to one or more target switches.

NOTE

Deployment from the Management application to a Network OS device is not supported.

Deploying DCB product, port, and LAG configurations

The switch, port, and LAG deployment dialog boxes provide common deployment options, save
configuration options, and schedule options. Depending on which product, port, or LAG you select,
the Deploy to Products, Deploy to Ports, or Deploy to LAGs dialog box displays upon deployment.

1. Select Configure > DCB from the menu bar.

The DCB Configuration dialog box displays, showing the status of all DCB-related hardware and
functions.

2. Select a switch, port, or LAG, and click Edit.

3. Configure the switch, port, or LAG. When you have finished the configuration, click OK to

launch the appropriate dialog box. Refer to

Figure 243

,

Figure 244

, and

Figure 245

.

Advertising