Port commissioning deployment results, Recommissioning all ports on a blade – Brocade Network Advisor SAN User Manual v12.3.0 User Manual

Page 590

Advertising
background image

538

Brocade Network Advisor SAN User Manual

53-1003154-01

Port commissioning

12

Recommissioning all ports on a blade

NOTE

All ports on the blade must be managed by the Management application.

Select a port on the blade for which you want to recommission all ports, and then select Configure
> Port Commissioning > Recommission > All Ports on the Blade.

NOTE

You can only recommission ports from the logical switch, not the physical chassis.

While recommissioning is in progress, an up arrow icon displays next to the port icon in the Product
List. You can view the port commissioning results in the deployment reports (refer to

“Viewing a

port commissioning deployment report”

on page 539).

When the recommission is complete, an application event displays in the Master Log detailing
success or failure.

Port commissioning deployment results

FIGURE 216

Port commissioning deployment results

The Deployment Results contains the following data:

Date and Time — The date and time of the deployment.

Export — Select to export the results to CSV or HTML (refer to

“Exporting and saving a report to

a file”

on page 540).

Email — Select to e-mail the results (refer to

“E-mailing a report”

on page 540).

Advertising