3Ć16

Rapidlab 800 Operator's Manual

9.

Press

Yes

to perform a two-point calibration.

10. Analyze a minimum of two levels of quality control material to verify sensor

performance.

Press

CANCEL

to stop conditioning. The system performs a wash and then

displays the Calibrate System message box.

Checking the Gas Tank Pressures

The main tank pressure must be higher than 300 psi. The second stage pressure
must be 3 to 5 psi.

1.

Check the main tank and second-stage pressure for each gas tank by looking at
pressure gauges on the gas tank regulator as shown in Figure 3-4.

Figure 3Ć4.āăCalibration Gas Tank Regulator

Needle Valve

Adjustment Knob

SecondĆstage

Pressure Gauge

Gas Tank

Main Tank Pressure

Gauge

2.

If the main tank pressure is below 300 psi, verify that the gas tank is open.

3.

If the main tank is open and the pressure is still below 300 psi, replace the tank
as described in Replacing the Gas Tanks, page 3-90

.