Bayer HealthCare Rapidlab 800 User Manual

Page 615

Advertising
background image

Installation

HĆ23

Cleaning Reagents from the Reagent Manifold

1.

Remove all the reagent bottles from the system and perform a prime sequence.

2.

Access the Prime screen from the Menu screen:

a. Select

2 Maintenance

and press

Enter

.

b. Select

3 Prime

and press

Enter

.

3.

Select

All Reagents

and press

Enter

.

4.

Press

Done

.

5.

Press

Menu

to return to the Menu screen.

6.

Press

No

.

7.

Access Fluidics Functions from the Menu screen:

a. Select

3 Troubleshooting

and press

Enter

.

b. Select

1 Fluidics System

and press

Enter

.

c. Select

1 Fluidics Functions

and press

Enter

.

8.

Select

C1/C2

and press

Enter

.

9.

Press

Start Test

.

10. Press

Exit Test

.

11. Empty, rinse, and fill the four reagent bottles with reagent water.

12. Install the reagent bottles containing reagent water in place on the system.

13. Perform a Prime sequence as described in steps 2 through 6.

14. Perform an C1/C2 Fluidics Function Test as described sequence 7 through 10.

15. Remove the reagent bottles.

16. Air dry the pathways:

a. Repeat steps 2 through 6 without the reagent bottles in place.

b. Repeat steps 7 through 10 without the reagent bottles in place.

Cleaning the Sample Port

1.

Stop the system from the Menu screen:

a. Select

2 Maintenance

and press

Enter

.

b. Select

7 Stop System

and press

Enter

.

2.

Grasp the sample door and pull it to the right as shown in Figure H-6.

3.

Grasp the tab on the retainer ring and firmly pull the tab toward you to rotate
the ring.

2

Menu Code

3

1

Menu Code

1

3

2

Menu Code

7

Advertising