1 prepare controller for commissioning, Prepare controller for commissioning, 3commissioning – Lenze 8400 HighLine User Manual

Page 58

Advertising
background image

3

Commissioning

3.7

Commissioning of the "Actuating drive speed" technology application

58

Lenze · 8400 HighLine · Referenzhandbuch · DMS 10.0 EN · 06/2014 · TD05/TD14

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

3.7.1

Prepare controller for commissioning

1. Power terminal wiring.

Refer to the mounting instructions supplied with the drive controller to find help on how to

correctly design the power connections to match the requirements of your device.

2. Control terminal wiring.

The assignment for your digital inputs should correspond to one of the preconfigured control

modes (

C00007

) for terminal control:

3. Inhibit controller: Set terminal X5/RFR to LOW level or open contact.
4. Connect USB diagnostic adapter.
5. Switch on voltage supply of the controller.

• Without motor operation: Connect external 24 V supply.
• With motor operation: Connect mains voltage.

If the green "DRV-RDY" LED is blinking and the red "DRV-ERR" LED is off, the controller is ready for

operation and commissioning can proceed.

Related topics:

Automatic restart after mains connection/fault...

( 122)

LED status displays

( 616)

Assignment of the digital terminals

Control mode

DI1

DI2

DI3

DI4

Terminals 0

JOG 1/3

JOG 2/3

DCB

Cw/Ccw

Terminals 2

JOG 1/3

JOG 2/3

QSP

Cw/Ccw

Terminals 11

Cw/Ccw

DCB

MPotUp

MPotDown

Terminal 16

JOG 1/3

JOG 2/3

Cw/QSP

Ccw/QSP

Abbreviations used:

JOG Selection of fixed setpoints 1 ... 3 parameterised in

C00039/1...3

DCB Manual DC-injection braking

Cw/Ccw CW/CCW rotation

QSP Quick stop

MPotUp Motor potentiometer: Increase speed

MPotDown Motor potentiometer: Reduce speed

Cw/QSP Fail-safe selection of the direction of rotation in connection with quick stop

Ccw/QSP

Advertising