2 servopack – Yaskawa DR2 Sigma Servo User Manual

Page 401

Advertising
background image

6.1 Inspection and Maintenance

389

6.1.2 Servopack

For inspection and maintenance of the Servopack, follow the inspection procedures in the
table below at least once every year.

The Servopack contains highly reliable parts and daily inspection is not required. Carry out
the inspections and maintenance in the table below once every year.

Item

Frequency

Procedure

Remedy

Clean unit interior and

circuit boards

Yearly

Check for dust, dirt, and oil on

the surfaces.

Clean with

compressed air.

Loose screws

Yearly

Check for loose terminal block

and connector screws.

Tighten any loose

screws.

Defective parts in unit

or on circuit boards.

Yearly

Check for discoloration, damage

or discontinuities due to heating.

Contact your Yaskawa

representative.

Part Replacement Schedule

The following parts are subject to mechanical wear or deterioration over time. To avoid failure,
replace these parts at the frequency indicated.

Part

Standard

Replacement Period

Replacement Method

Smoothing Capacitor

7 to 8 years

Replace with new part.

Relays

---

Replace with new parts.

Fuse

10 years

Replace with new part.

Aluminum Electrolytic

Capacitor on Circuit Board

5 years

Replace with new circuit board.

Note

Operating Conditions:

• Ambient Temperature: annual average 30°C

• Load Factor: 80% max.

• Operation Rate: 20 hours/day max.

6

Advertising
This manual is related to the following products: