Direct i/o mtb panel integration, Input interface connector – Rockwell Automation 8520 9/Series CNC Integration Maintenance Manual Documentation Set User Manual

Page 505

Advertising
background image

Section 9A

Operator Interface

9A-38

Figure 9A.22

Direct I/O MTB Panel Connectors

CN 1

CN 2

P1

1 2 3

Control ON lamp
operation selection

Input conector CN1
Pin 1

Output conector CN2

Pin 1

MTBI

MTBD

Direct I/O MTB panel integration

1) Note the locations of pin number one (#1) of CN1 and CN2 .

Although the pin #1 locations are the same with respect to the connector

keying, the connectors are oriented differently.
2) The P1 jumper is used to set the operation of the “control on” Lamp.

In the 1--2 position (MTBD) the lamp is controlled by the I/O system (on

when 24V is applied to pin CN2--32). In the 2--3 position (MTBI) the

lamp is on whenever 24V is applied to the panel.

Input Interface Connector

Input signals from the direct I/O MTB panel are sent through input

connector CN 1 . These signals are available for use by the I/O system by

pins supplied with this panel. Table 9A.S shows the pin assignments and

functions for input interface ribbon cable on the push-button MTB panel.

Advertising