Rockwell Automation 8520 9/Series CNC Integration Maintenance Manual Documentation Set User Manual

Page 804

Advertising
background image

Section 15B

Replacement Procedures

15B-48

4.

Remove the 5 mounting screws, shown in Figure 15B.11, that

connect the rotary MTB panel I/O module to the stand-offs.

Figure 15B.11

Rotary MTB Panel I/O Module Mounting Screw Locations

+12 Vdc
GND

CN51

CN52

OP11

(out)

OP12

(in)

I/O ring fault indicator

JP1

JP2

5.

Replace the old rotary MTB panel I/O module with a new rotary

MTB panel I/O module.

6.

Replace and tighten the 5 mounting screws then reconnect all cables.

7.

Set the node address to match the settings on the old rotary MTB

panel by cutting the wire jumpers on the new rotary MTB panel I/O

module.

Figure 15B.12

Rotary MTB Panel I/O Module Jumper Positions

+12 V DC
GND

CN51

CN52

OP11

(out)

OP12

(in)

I/O ring fault indicator

JP1

JP2

C26

C27

Advertising