Rockwell Automation 8520 9/Series CNC Integration Maintenance Manual Documentation Set User Manual

Page 792

Advertising
background image

Section 15B

Replacement Procedures

15B-36

To replace the Hand Pulse Generator and Interface Board

1.

Turn OFF all power to the control.

ATTENTION: To guard against electrical shock hazards, never

make connections or disconnections at the AC distribution

network unless the main AC disconnect switch is open and

locked.

2.

Disconnect the cable running from the operator panel power supply to

the HPG interface board.

3.

Disconnect the fiber optic cables.

4.

Remove the screw holding the handle on the HPG interface board

then remove the handle.

5.

Disconnect the cable running from the HPG to the HPG interface

board.

6.

Remove the 3 nuts on the HPG mounting studs that hold the HPG to

the cabinet or front panel.

Important: The HPG interface board is mounted behind the front panel

using 2 of the 3 nuts that secure the HPG to the front panel. When the nuts

holding the HPG to the front panel are removed, the HPG interface will

come off.

7.

If the HPG or HPG interface board is defective, replace it with a new

HPG.

8.

Match the setting of the switch assembly on the new HPG interface

board to that of the one being replaced as shown below.

9.

Put the HPG back onto the cabinet or front panel.

10. Place the HPG interface board onto two of the mounting studs of the

HPG.

11. Tighten the 3 nuts.

15B.21

Replacing the Hand Pulse

Generator and Interface

Board

Advertising