5 changing the processing order, Changing the processing order 1, Changing the processing order – Lenze 8400 User Manual

Page 1141: 17 working with the fb editor

Advertising
background image

Lenze · 8400 protec HighLine · Reference manual · DMS 3.0 EN · 03/2013 · TD05

1141

17

Working with the FB Editor

17.4

Reconfiguring the predefined interconnection

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

17.4.5

Changing the processing order

If you insert a function block into the interconnection, an order index is automatically assigned to

this function block. By means of this order index it is defined in which order the individual function

blocks are calculated at runtime.

• The first function block inserted contains the order index "1", the next function block inserted

contains the order index "2", etc.

• The respective order index is displayed in the header of the function block in the rectangle after

the block name.

[17-10] Example: Function blocks with order index

Note!

When a function block is shifted, its order index is maintained.
The processing order influences the result!

• In certain cases it may be sensible to change the processing order, but if you select an

unfavourable processing order, errors may arise!

Advertising