D_port window descriptions, Figure 13-5, D port window field definitions – Dell Emulex Family of Adapters User Manual

Page 269: D_port window test phase results list, D_port window buttons

Advertising
background image

OneCommand™ Manager Application

P010066-01A Rev. A

13. Diagnostics

LightPulse FC HBA Diagnostics

269

3. Click Start Tests.

Figure 13-5 D_Port Tests window

D_Port Window Descriptions

D Port Window Field Definitions

Overall Test Result – Displays PASSED or FAILED depending upon the

outcome of all the test phases.

Frame Size – The size of the frames used in each test phase.

Frame Count – The number of frames generated during each test phase.

Roundtrip Link Latency – Estimated cable length calculated by switch during

the execution of all tests.

Estimated Cable Length – Estimated cable length calculated by switch during

the execution of all tests.

D_Port Window Test Phase Results List

Test Phase – The name of the test run.

Phase Result – The result of the test run. Possible results are Pass, Fail, or

Skipped.

Phase Latency – The round trip legacy (in ns.) calculated during the execution of

the test.

Local Error – The error(s), if any, detected on the local side of the test.

Remote Error – The error(s), if any, detected on the remote side of the test.

D_Port Window Buttons

Start Tests – Click to start D_Port tests. The start time is displayed.

Stop Tests – Click to stop running D_Port tests. The stop time is displayed.

Save Results to File - Click to save test results to a file you specify.

Advertising