9 pto work coordinate – Rockwell Automation 8520-ARM2 9/Series CNC AMP Reference Manual Documentation Set User Manual

Page 442

Advertising
background image

Power-up G-code Parameters

Chapter 19

19-10

Function

This parameter selects the default work coordinate system. It determines

the work coordinate system that is activated at power-up, control reset, or

when a G92.1 is programmed. The default work coordinate system may

also be be activated when the control executes an end-of-program block

(M02/M30) if the the value of parameter Reset Coord Offsets on

M02/M30 is “yes.”

Axis

Parameter Number

Single Process

Process 1

Process 2

All

[15]

[20015]

[21015]

Range

Selection

Result

Selection

Result

(a)

None

(f)

G58

(b)

G54

(g)

G59.1

(c)

G55

(h)

G59.2

(d)

G56

(i)

G59.3

(e)

G57

Notes

This is a global parameter. The value set here applies to all axes.
For dual--processing controls, this is a per process parameter. The value set

in the parameters applies to all of the axes assigned to that process.

19.9

PTO Work Coordinate

Advertising