Rockwell Automation 8520-ARM2 9/Series CNC AMP Reference Manual Documentation Set User Manual
Page 53
Using AMP Applications and ODS Utilities
Chapter 2
2-27
9.
The workstation starts uploading a copy of the active AMP file to the
workstation. The workstation continuously updates and displays the
percentage of the file that has been transferred.
The workstation then displays this screen:
Proj:
TEST
Appl:
Upload
Util: Get AMP params
F2-Project F3-Application F4-Utility
F5-Configuration
F1-File
Recovering Control Image
The workstation recovers the AMP control image and creates an AMP file
that you can edit.
When the upload process is complete, the workstation displays the
message:
Upload complete
Press any key to return the workstation to the main menu line of ODS.
If you changed any parameter values while using Patch AMP or on-line
AMP and these values are out of range, the workstation will not be able to
recover the control image of the AMP file unless the parameters are
corrected.