Using AMP Applications and ODS Utilities

Chapter 2

2-27

9.

The workstation starts uploading a copy of the active AMP file to the

workstation. The workstation continuously updates and displays the

percentage of the file that has been transferred.

The workstation then displays this screen:

Proj:

TEST

Appl:

Upload

Util: Get AMP params

F2-Project F3-Application F4-Utility

F5-Configuration

F1-File

Recovering Control Image

The workstation recovers the AMP control image and creates an AMP file

that you can edit.

When the upload process is complete, the workstation displays the

message:

Upload complete

Press any key to return the workstation to the main menu line of ODS.

If you changed any parameter values while using Patch AMP or on-line

AMP and these values are out of range, the workstation will not be able to

recover the control image of the AMP file unless the parameters are

corrected.