Using amp applications and ods utilities chapter 2 – Rockwell Automation 8520-ARM2 9/Series CNC AMP Reference Manual Documentation Set User Manual
Page 52
Advertising
Using AMP Applications and ODS Utilities
Chapter 2
2-26
7.
Select the Control option.
The workstation displays this screen:
Proj:
TEST
Appl:
Upload
Util: Get AMP params
F2-Project F3-Application F4-Utility
F5-Configuration
F1-File
Name of file to be uploaded
Type in name.
Press ENTER when done, or ESC to cancel.
AMP1
AMP2
AMP3
Enter Name:
[
]
8.
Type in a new file name for the file that will be uploaded, then press
[ENTER]
.
Important: You must assign a new name to the AMP file that is
uploaded.
The workstation displays this screen:
Proj:
TEST
Appl:
Upload
Util: Get AMP params
F2-Project F3-Application F4-Utility
F5-Configuration
F1-File
Upload in progress
Percent transferred 50%
Advertising