Using amp applications and ods utilities chapter 2 – Rockwell Automation 8520-ARM2 9/Series CNC AMP Reference Manual Documentation Set User Manual

Page 52

Advertising
background image

Using AMP Applications and ODS Utilities

Chapter 2

2-26

7.

Select the Control option.

The workstation displays this screen:

Proj:

TEST

Appl:

Upload

Util: Get AMP params

F2-Project F3-Application F4-Utility

F5-Configuration

F1-File

Name of file to be uploaded

Type in name.

Press ENTER when done, or ESC to cancel.

AMP1

AMP2

AMP3

Enter Name:

[

]

8.

Type in a new file name for the file that will be uploaded, then press

[ENTER]

.

Important: You must assign a new name to the AMP file that is

uploaded.

The workstation displays this screen:

Proj:

TEST

Appl:

Upload

Util: Get AMP params

F2-Project F3-Application F4-Utility

F5-Configuration

F1-File

Upload in progress

Percent transferred 50%

Advertising