Using amp applications and ods utilities chapter 2 – Rockwell Automation 8520-ARM2 9/Series CNC AMP Reference Manual Documentation Set User Manual
Page 61
Advertising
![background image](/manuals/580257/61/background.png)
Using AMP Applications and ODS Utilities
Chapter 2
2-35
4.
Select the Document utility.
The workstation displays a screen showing that it is loading the
selected utility, then displays this screen:
Proj:
TEST
Appl:
AMP
Util:
Document
F2-Project F3-Application
F1-File
F4-Utility
F5-Configuration
A M P
D O C U M E N T O R
Document File
(D)
Quit
(Q)
5.
Select the Document File option.
The workstation displays this screen:
Proj:
TEST
Appl:
AMP
Util: Document
F2-Project F3-Application F4-Utility
F5-Configuration
F1-File
Use ARROW keys or type in name. Press ENTER when done or ESC to cancel
AMP1
AMP2
AMP3
Document File...