Start sequence – Yaskawa MP940 Reference Manual User Manual

Page 46

Advertising
background image

Start, Stop Sequence

MotionSuite™ MP940 Machine Controller Reference Manual

3-4

Memory Initialization

The memory as initialized, and the user programs and configuration data are
deleted upon setting the DIP switches in the following order, and cycling the
power OFF/ON.

Note: The memory is cleared if the battery is removed with the module
power OFF.

Start Sequence

The MP940 makes various determinations at start-up, and upon recognizing
an error, flashes the ERR LED, showing the content of the error by the

number of flashes. MotionWorks

TM

cannot be operated while the LEDs are

flashing. The following table shows a partial list of the MP940 display LEDs.

1

2

3

4

5

Turn MP940

power OFF

Turn DIP

switches INITIAL

and TEST ON.

Check that the

RDY and RUN

LEDs blink when

power is fed

(approximately

3 seconds).

Return the RUN

DIP switch to the

ON setting

Turn the power

ON again

NO

1

2

3

4

5

6

RUN

INITIAL

TEST

FLASH

P.P

COPY

NO

1

2

3

4

5

6

RUN

INITIAL

TEST

FLASH

P.P

COPY

Advertising