Lenze E82xVxxxKxxxxx User Manual

Page 118

Advertising
background image

Electrical installation

Basics for wiring according to EMC
Installation in the control cabinet

6

l

118

EDS82EV903 EN 3.0

Continuation of cable routing

Separation of the "hot" motor cable from the control, signal, and mains cables:

ƒ

Never install motor and signal cables in parallel and only cross at right angles

ƒ

The cables of a 24 V power supply unit (plus and minus cable) must be installed
closely together over their entire length in order that no loops may occur.

Fig. 6−5

Cable routing in the control cabinet

Advertising