Mechanical installation, Mounting – Lenze E82xVxxxKxxxxx User Manual

Page 74

Advertising
background image

Mechanical installation

Standard devices in a power range from 3 ... 11 kW
Thermally separated mounting (push−through technique)

5

l

74

EDS82EV903−3.0

Mounting

a1

a2

a3

b3

b3

b2

8200vec310

Fig. 5−12

Dimensions for thermally separated mounting cutout 3 ... 11 kW

Dimensions [mm]

8200 vector

a1

a2

a3

b2

b3

E82DV302K2C

80

+1

50

15

224

+1

23

E82DV402K2C

E82DV552K2C

123

+1

75

24

E82DV752K2C

E82DV302K4C

80

+1

50

15

E82DV402K4C

E82DV552K4C

E82DV752K4C

123

+1

75

24

E82DV113K4C

1. Slide earthing clamps on the frame with the correct sides:

– The contact springs have to point towards the rear panel of the control cabinet.
– The cutouts of the seal specify the positions.

2. Insert 8200 vector into cutout.

3. Tighten by means of 4 screws M4x10.

– Tightening torque: 1.7 Nm (15 lb−in)

Advertising