Mechanical installation, Mounting – Lenze E82xVxxxKxxxxx User Manual
Page 74
Advertising
![background image](/manuals/566070/74/background.png)
Mechanical installation
Standard devices in a power range from 3 ... 11 kW
Thermally separated mounting (push−through technique)
l
74
EDS82EV903−3.0
Mounting
a1
a2
a3
b3
b3
b2
8200vec310
Fig. 5−12
Dimensions for thermally separated mounting cutout 3 ... 11 kW
Dimensions [mm]
8200 vector
a1
a2
a3
b2
b3
E82DV302K2C
80
+1
50
15
224
+1
23
E82DV402K2C
E82DV552K2C
123
+1
75
24
E82DV752K2C
E82DV302K4C
80
+1
50
15
E82DV402K4C
E82DV552K4C
E82DV752K4C
123
+1
75
24
E82DV113K4C
1. Slide earthing clamps on the frame with the correct sides:
– The contact springs have to point towards the rear panel of the control cabinet.
– The cutouts of the seal specify the positions.
2. Insert 8200 vector into cutout.
3. Tighten by means of 4 screws M4x10.
– Tightening torque: 1.7 Nm (15 lb−in)
Advertising