Dc−bus operation – Lenze E82xVxxxKxxxxx User Manual

Page 468

Advertising
background image

DC−bus operation

Fuses and cable cross−sections
Mains supply

12

l

468

EDS82EV903−3.0

8200 vector

Rated fuse current

Cable cross−section

Fuse

Circuit−breaker

Laying system L1, L2, L3, PE

B2

C

Type

[A]

[A]

[mm

2

]

[mm

2

]

Mains 3/PE AC 230/240 V − operation with mains choke/mains filter

E82xV551K2C

C6

1.0

1,0

E82xV751K2C

C6

1.0

1,0

E82xV152K2C

16

C16

2 x 1.5

2 x 1.5

E82xV222K2C

16

C16

2 x 1.5

2 x 1.5

E82xV302K2C

20

C20

4.0

2.5

E82xV402K2C

25

C25

6.0

1)

4.0

E82xV552K2C

C32

6.0

1)

E82xV752K2C

C32

6.0

1)

Mains 3/PE AC 400/500 V operation with mains choke/mains filter

E82xV551K4C

C6

1.0

1.0

E82xV751K4C

C6

1.5

1.0

E82xV152K4C

C10

1.5

1.0

E82xV222K4C

C10

1.5

1.0

E82xV302K4C

20

C20

4.0

2.5

E82xV402K4C

20

C20

4.0

2.5

E82xV552K4C

20

C20

4.0

2.5

E82xV752K4C

32

C32

6.0

1)

E82xV113K4C

32

C32

6.0

1)

E82xV153K4B

80

25

E82xV223K4B

80

25

E82xV303K4B

80

25

E82xV453K4B

160

70

E82xV553K4B

160

70

E82xV753K4B

250

120

E82xV903K4B

250

120

1)

Pin−end connector required, since a maximum cable cross−section of 4 mm

2

can be connected to the inverter.

Advertising