Electrical installation, Realisation – Lenze E82xVxxxKxxxxx User Manual

Page 122

Advertising
background image

Electrical installation

Standard devices in a power range from 0.25 ... 2.2 kW
EMC−compliant wiring

6

l

122

EDS82EV903 EN 3.0

Realisation

M

3~

PES

L < 500 mm

L < 40 mm

PE

PE

PE

8
9

PES

PES

1

2

3

4

5

6

7

0

8200vec008

Fig. 6−7

Wiring in compliance with EMC standards

0

Mounting plate with electrically conductive surface

1

Control cable to the function module, connect the shielding to the EMC shield sheet (PES) with
a surface as large as possible

2

2−pole terminal for motor PE and motor shield

3

PE of the motor cable

4

Shield of the motor cable

5

Shielded motor cable, low−capacitance
(Core/core 1.5 mm

2

£ 75 pF/m; from 2.5 mm

2

£ 100 pF/m; core/shield £ 150 pF/m)

6

Shielded PTC cable or thermal contact cable

7

Connect the cable shields to the EMC shield sheet (PES) with a surface as large as possible. Use
the supplied shield clamps.

8

Star or delta connection as indicated on the motor nameplate

9

EMC cable connector (not included in the delivery package)

Advertising