Displaying the mesh link status, Mesh link monitoring, Mesh link test – H3C Technologies H3C WX3000E Series Wireless Switches User Manual

Page 471

Advertising
background image

450

NOTE:

If you select Auto or Close for dynamic channel selection on the Global Setup tab, when you enter the
Mesh Channel Optimize page, the Channel Optimize button is grayed out, and you cannot perform
the operation.

If you select manual DFS on the Global Setup tab, select mesh networks where DFS will be performed,
and then click Channel Optimize to complete DFS. In auto mode, DFS is performed at the calibration

interval. In manual mode, DFS is performed one time.

Table 144 Field description

Field Description

AP

AP name in the mesh network.

Radio

Radio of the AP.

Chl(After/Before) Channels

before and after channel optimization.

Date(yyyy-mm-dd)

Date, in the format of yyyy-mm-dd.

Time(hh:mm:ss)

Time, in the format of hh:mm:ss.

Displaying the mesh link status

Mesh link monitoring

1.

Select Wireless Service > Mesh Service from the navigation tree.

2.

Click the Mesh Link Info tab.

Figure 480 Displaying the mesh link monitoring information

You can monitor the mesh link status in real-time on the mesh link monitoring page.

Mesh link test

1.

Select Wireless Service > Mesh Service from the navigation tree.

2.

Click the Mesh Link Test tab.

Advertising