Modifying a scheduled report – H3C Technologies H3C Intelligent Management Center User Manual

Page 1057

Advertising
background image

1043

reports with data collection periods from 2010-10-10 00:00 to 2010-11-10 00:00 and from

2010-11-10 00:00 to 2010-12-10 00:00.

12.

If you want to configure an end date and time for a scheduled report task, click the checkbox
to the left of End by in the Schedule Time Settings section.
The Add Scheduled Report window updates to include an End by field.

13.

Select the end date and time for the scheduled report task by clicking the End by field.

14.

Select the date and enter the time from the displayed calendar.
Once you have defined the end date and time for a scheduled report task, no new scheduled

report is generated for the task after the end date and time.

15.

Select the report file format for the scheduled report by selecting it from the Report File Format list
in the Delivery Options section. Options include PDF, CSV, MS Excel, and MS Excel (Data-Only).

16.

If you want to configure an email recipient for the scheduled report, click the checkbox to the
left of Send by Email.
The Add Scheduled Report window updates to include a field to the right of Send by Email to enter
the email address for the Email recipient.
Enter the full email address of the recipient in this field.
IMC sends an email to the email recipient (if specified) when generating a scheduled report.
For IMC to send scheduled reports to email recipients, the SMTP mail server settings for IMC must
be configured. For more information about configuring IMC mail server settings, see "

Configuring

IMC for email notification

."

17.

Set parameters, if any, located at the bottom of the Add Scheduled Report window.
Parameters include:

{

View Name: Sets the view for which a report is generated.

{

Begin Time: Sets the start time for the specific time range in a data collection period.

{

End Time: Sets the end time for the specific time range in a data collection period.

18.

Click the Set Parameter icon in the Set Parameter field.
If the parameter was set, this Set Parameter field is updated to icon.

19.

If you want to modify the parameter, click .
Begin Time must be earlier than End Time.

20.

Click OK.
Quick Custom reports cannot be scheduled. Only Real Time reports can be scheduled.

Modifying a scheduled report

To modify a scheduled report:

1.

Navigate to Report > All Scheduled Reports:

a.

Click the Report tab from the tabular navigation system on the top.

b.

Click Scheduled Reports on the navigation tree on the left.

c.

Click All Scheduled Reports under Scheduled Reports from the navigation system on the left.

2.

Click the Modify icon associated with the scheduled report you want to modify.
You cannot modify the Template Name and the Scheduled Report Name once you have created it.

3.

Change the data collection period for the scheduled report by clicking the radio button to the
left of the schedule frequency you want to apply to this report in Schedule Type section.

Advertising